Stage 1 of 6: Raw material

AnbuselvanAnbalagan

Production Supervisor

8+ years across food, FMCG and pharmaceutical plants. I plan the shift, run the line and fix what stops it, with GMP, food safety and HSE built into every hour.

AAPortrait of Anbuselvan Anbalagan

About me

A manufacturing professional with hands-on experience in production supervision, shift execution, team coordination, process troubleshooting and food safety practices. Currently in chocolate manufacturing in Dubai, with earlier experience in biscuit production and pharmaceutical packaging equipment.

Career objective: contribute to a progressive food or FMCG manufacturing operation in a production leadership role, applying practical process knowledge, team coordination and continuous-improvement thinking.

0+years in food, FMCG and pharmaceutical manufacturing
0years in biscuit production and packaging
0chocolate varieties taken from trial to commercial production
31–50employees supervised per shift

Leadership

Shift executionPeople managementPerformance trackingCross-functional coordination

Experience

Aug 2025 – Present

Production Supervisor

Katrina Factory FZE, Dubai, UAE (chocolate / FMCG)
  • Coordinate daily production planning, shift targets and execution, allocating manpower across about 31–50 employees.
  • Monitor hourly output, line performance and downtime against targets.
  • Coordinate breakdown response with the technical team; troubleshoot first-level faults on kitchen, Conbar and Krokant lines.
  • Run line setup, start-up, changeovers, cleaning and pre-production checks under SOP, GMP, food safety and HSE rules.
  • Monitor scrap, rework and material usage; keep handover, reports and records accurate.
  • Coordinate with QA, Maintenance and Warehouse teams.
Jan 2025 – May 2025

Mechanical Technician

Ansell Sterile Solutions Pvt Ltd, Erode, India (pharmaceutical)
  • Restored Bi-Fold packaging, flexi printing and thermoforming machines to reliable operation in a GMP environment.
  • Supported commissioning and qualification (IQ, OQ, PQ).
  • Diagnosed mechanical and operational faults and supported corrective actions.
Aug 2018 – Jun 2024

Production, Biscuit Manufacturing

ITC ICML Ltd, Viralimalai, Tamil Nadu, India
  • About 6 years across mixing, maida handling, raw material handling, process troubleshooting and packing.
  • Supported packaging operations and machine troubleshooting while meeting quality and food safety requirements.
  • Worked with teams to reach output targets and improve line performance.

Skills

QC passed

Production management

Production planningSchedulingDaily supervisionManpower planningWork allocationShift handoverOutput monitoringTarget achievement

Quality and compliance

GMP / cGMPFood safetyHygieneSOP complianceLine clearanceBatch documentationMaterial reconciliationDeviation reportingCAPAHACCPScrap and rework monitoring

Efficiency and improvement

OEELine efficiencyDowntime reductionRoot cause analysis5 WhyContinuous improvementWaste reduction

Technical and equipment

Packaging machine troubleshootingLine setup and start-upChangeoverPreventive maintenance coordinationCommissioning supportIQ / OQ / PQBi-FoldFlexi printingThermoformingConbar and Krokant troubleshootingChocolate manufacturingBiscuit manufacturing

Leadership and safety

Team leadershipTeam coordinationCross-functional communicationHSEWorkplace safetyProblem solving

GMP

Good Manufacturing Practices
Alison, completed 18 October 2026
Certificate ID 7400-56004138

Verify certificate

HACCP

Hazard Analysis Critical Control Point
Alison, completed 9 October 2026
Certificate ID 5690-56004138

Verify certificate

Education

ITI Fitter, 86.4%
Government Industrial Training Institute, Andimadam, India. 2014 – 2016

Languages

English working proficiency
Tamil native

Alison certificates are course-completion certificates, not professional licences or accredited diplomas.

Projects, tap a box to open

Completed

Production capacity improvement

Process improvement and line optimization raised shift capacity from 24 MT to 28 MT, a gain of 4 MT per shift (about 16.7%).

Successful trial

CIP cleaning time reduction

Trial cleaning time dropped from 4 hours to 2 hours (50%). Routine use depends on approved cleaning and food-safety procedures.

Production contribution

Chocolate product development

Supported three chocolate varieties from trial to commercial production: process parameters, machine settings, manpower coordination, troubleshooting and product quality.

Ongoing

Conbar and Krokant line troubleshooting

Machine operation, process fault identification, corrective action and coordination with the technical team.

Ongoing

Scrap and waste monitoring

Tracks primary and secondary laminate scrap, rework, metal detector rejects, output and material reconciliation.

Proposed concept, not implemented

Kitchen process automation

After two milk-mix batches, caramel preparation starts automatically. After six caramel batches, the product moves to the drain line and load-cell feedback drains 30 kg, then the cycle repeats. Needs engineering review, PLC/HMI development, interlocks, calibration, trials and food-safety approval.

Achievements

  • Raised shift capacity from 24 MT to 28 MT.
  • Cut CIP cleaning time from 4 hours to 2 hours in a successful trial.
  • Supported three chocolate varieties from trials to commercial production.
  • Received appreciation from management for contribution and performance in manufacturing operations.

Dispatch: let’s talk

Open to Production Supervisor roles. Based in Dubai, UAE, with a 30-day notice period.

anbudxb2025@gmail.com